Legalisation of wells and boreholes in Murcia

Many wells were drilled decades ago, with or without incomplete documentation. Regularizing the harvesting and its use allows the use of water with legal certainty and avoids sanctions, requirements and problems when selling or transmitting the farm.

Well and water use: two different concepts

The well or survey is the collection work: the drilling, its depth and its extraction equipment. The Development is the right to the private use of water: what volume can be extracted, for what purpose, on which farm and with what title. A well can exist without its use being regularized, and the same use can be supplied by several captures.

For this reason, regularizing requires the accreditation of both the collection (location and technical characteristics) and the use (title, flow, destination and holder). Legalization of the work, registration or modification of the right in the Water Register and change of title are different procedures, and may affect one, the other or both.

First step: know the situation of the well

Regularization requires a thorough study of the historical background of the collection and of the entire file, based on the comprehensive knowledge of the Segura basin and all applicable legislation. Not all wells are in the same situation. Some have a title or an inscription that does not correspond to reality; others lack it; others are in the process or are already the subject of a file. Before you present anything you need to know what is in the basin body and what can be credited: seniority, flow, water destination, irrigated area and ownership.

Regular documentation

  • Collection data: location, depth, flow and extraction equipment.
  • The title of the estate and of the exploitation.
  • Justification for use: irrigated area, crops or industrial activity.
  • Documents that demonstrate seniority, where they exist: scriptures, inscriptions, invoices or orthophies.
  • Technical report signed by competent technician, where the procedure requires it.

How it is processed

A complete application is prepared to reduce requirements, it is submitted to the Segura River Basin Authority the public information and reporting procedures are dealt with and followed up to the resolution. If it is not favourable, the appropriate remedy is examined.

If there's already an open file

If you have received a notification for non-title or for more than authorized, do not sign or answer without reviewing the document. There are actions that can prove flow, water destination or measurement errors, and the time limits to claim are short.

What can happen if it is not regularized

An unqualified recruitment may result in a penalty file, the obligation to restore the previous situation and difficulties in transmitting the estate.

Community well

When a well serves several owners or a community, it is necessary to care for ownership, the distribution of flows and representation before the Segura River Basin Authority. It is studied in conjunction with existing statutes or agreements.

Important

Each well is different and the viability of regularization depends on the documentation available and the conditions of the water mass. It is not possible to assess it without studying the case.

Can you legalize a well that already exists?

In some cases it is possible to regularize it. It depends on its age, available documentation and the situation of the aquifer. It requires a prior analysis.

What documents do I need to start with?

With the titles of ownership, any historical document of the well and the available technical data is sufficient for a first assessment.

Request a consultation

You can file your case by phone (629 62 71 92), by mail (juanignacioruiz @ icamur.org) or by means of the contact form, and you will be told how to raise it. Monday to Friday, 9: 00 to 18: 00.

Related publication

On the private use of groundwater: «The survival of private groundwater use following the reform of Law 29 / 1985 of 2 August 1985 on water», contribution to the Second National Congress of Water Law (Murcia, 2005), collected in the collective work Water law (Euro-Mediterranean Water Institute, 2006, ISBN 84-933127-2-X), pp. 281-292. Fiction of the work in Dialnet.

Other services

EnglishenEnglishEnglish